Build #08: Heading Towards the First Milestone

For the last 2 weeks, I had not been seriously working on my layout, for the fact that I had other personal commitments to attend to. During their period, I allowed my layout to “take a rest” and “absorb some sun and humidity”. I think it is important to allow the wood to so-call “breath and adjust to the new environment”. As my friend and fellow N-scale modeller from UK said “that once you have cut your wood I wouldn’t leave it unsupported or leaning on anything. Try and keep it on as flat a surface as you can. Wood has a mind of its own and I hate bent timber.” True, some of the plywood did bent significantly. I had to put some weight on top to push it down. Thank God, it did come down flat or at least did not bend significantly anymore.

So the 2 weeks allowed me to observe the wood and checked on parts that were uneven. A little readjustment to end profiles to make sure they were square and aligned, screw holes were enlarged slightly to ensure that the modules fitted together. I clamped the end profiles after aligning them again and drilled the holes.

IMG_6751

After all the end profiles were aligned, I used the water level to check the vertical and horizontal levelness of each module and from Segment A to Segment E and back. Here was where the adjustable legs came in handy.

IMG_6752

At Segment E, the cross-bar supported the front panel of the module with two adjustable legs at each end. After some trials, I found the cross-bar was too high. Thus, I removed about 1.5cm from each end and lowered the bar.

IMG_6421

IMG_6753 IMG_6754

Now, all 5 segments are ready for track laying.

In my previous post, I showed how I drew the tracks using Atlas flex tracks. I stopped at end of Segment H. This week, I continued with Segment G. Tracks from mid-point of Segment H will start to climb 2.5% towards Segment E.

improvedgradient

IMG_6780

 IMG_6785

I started by laying and shaping the first track on the left. Using track laying tools (below), I adjusted the second track on the right with a 30mm track spacing. I slid the tools as I moved along and placed pins at strategic locations to maintain the shape of the curve while maintaining 3omm track spacing.

IMG_6722

IMAG3396 IMAG3398 IMG_6718

I am pleased with the optical look of the these tracks. Using a geometric compass, I drew the outlines of the track boundary so that I have about 8cm permanent right of ways. The needle traced the tracks while the lead drew the track boundary lines. The track boundaries would be the guidelines for me to cut with a jigsaw.

IMG_6786
IMG_6787
IMG_6788

So, the work for this weekend was lined up. There would be lots of cutting and adjusting the appropriate heights. Once the sub-roadbeds are done, the track laying could begin – starting with cork laying and then the tracks.

Advertisements

4 thoughts on “Build #08: Heading Towards the First Milestone

    • Thanks Sabri. Glad you enjoy reading them as much as I enjoy planning, building and blogging abt them.

      Btw, could you intro a bit abt yourself and your model modelling interests?

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s